Project Highlights. Bangaloe Metro – Fare Rules, Travel Guide & Helpline no. Bangalore Metro was not an easy project but it has been achieved by the hard work of the government authorities because Bangalore Metro faces lots of hurdle in terms of approval and funding. Currently, only Stage 1 of the system is operational, whereas Phase 2 is unfinished and Phase 3 under consideration. In total, the red line will have 24 stations. The metro was a huge project for the city of Bangalore and became the first underground metro to be constructed in the South of India. This map was created by a user. This phase involved the construction of 2 new lines on standard gauge tracks: Line-1 – Purple line – Baiyyappanahalli – Mysore Road (18.10 km) • Type: Elevated & Underground • Depot: Baiyappanahalli • … We hope to see all these 3 phases of the Bangalore metro to be completed soon, so that people have an alternate mode of transit to cover long distances. The Red Line is almost parallel to the Green Line if you observe the map carefully. Currently this is the route that the purple line takes and all these stations are operational. DPR for #NammaMetro Phase 3 will be launched soon, taking the total length to 266 kms. The eastern extension of the Purple Line will be from Baiyappanahalli to Whitefield. It would be known as Nammo Metro Airport Link. The total Bangalore Metro network length is 42.30 Km. Revenue also increased increased in 2018-19 to Rs 404.91 crores from ₹324.99 crore in 2017-18. Under the Bangalore Metro Phase 2 project, the green Line is being extended at both its terminal points. Smartcard holders get a discount of 5% on fare. There is currently one type of smart card available on the metro – Varshik. It informs you about all the places which are connected by the Bangalore Metro route and Stations on the line. In 2018-19, 16.4 crore ridership were recorded on the metro as compared to around 13 crores in 2017-18. There will be an overall extension of 3.77 kms northwards, which means 3 new stations. It also has a crown of the first metro rail system in South India. Bangalore (Namma) Metro is an urban Mass Rapid Transit System (MRTS) with 2 lines and 40 stations serving Bengaluru, Karnataka’s capital and largest city. It was opened to the public on 20 October 2011. Bangalore Metro Map14 - Bangalore Metro Phase 2 is a totally free PNG image with transparent background and its resolution is 1653x1638. Extension work of Bangalore Metro Green Line is still going on and in future, it will be connected to Bangalore International Exhibition Centre,  from Nagasandra and from Yelachenahalli, it will be connected till NICE Anjana Township. You can get the information about both the Green Line and Purple Line in the below shared Bangalore Metro Map. Bangalore Metro Green Line: Route Map, Stations, Timings, Destinations, Hyderabad Metro Route Map: Station List, Fare, Timings, Destinations. This is an extension of 6.29 kms and 5 new stations southwards. This metro station of Namma Metro is under construction expected opening last of year March 2023 . Its also visible by seeing the ridership in 2019. Phase 2: Line 1 – Green Line [BIEC – Anjanapura], North – South Line . The 21.25 km line connects Kalena Agrahara station (previously named Gottigere) on Bannerghatta road in the south with Nagawara station on Outer Ring road in the north. Phase 1 = 42 km Phase 2 = 72 km. To be precise approximately 4,15,000 people per day. This is expected to be completed in November 2020. Purple Line Timings . Bangalore Metro Route Station List – Green Line, Nagasandra – Dasarahalli – Jalahalli – Peenya Industry – Peenya – Goraguntepalya – Yeshwanthpur (Interchange/Connections/Yesvantpur Railway Station) – Sandal Soap Factory – Mahalakshmi – Rajajinagar – Kuvempu Road – Srirampura – Sampige Road – Majestic (Purple Line/Interchange/Connections/Bangalore City Railway Station/Kempegowda Bus Terminal) – Chickpet- Krishna Rajendra Market – National College – Lalbagh – Southend Circle – Jayanagar – Rashtreeya Vidyalaya Road – Banashankari – Jayaprakash Nagar – Yelachenahalli. The network is spread out across 42.3 km and also contains 40 stations. The Blue Line runs from Silk Road to KR Puram. We keep the Bangalore Metro Station Route Map updated with latest information and addition of stations. of Gates, Metro Line, Platform Information, Parking facility and availability of ATMs in Metro Stations. Sam India – Gulermak started setting up their casting yard in Majlis Park back in July and commenced piling work for the main-line in September. The frequency on the Purple Line varies between 4-15 minutes. For project info, route maps with stations, fares, news & construction updates visit: http://themetrorailguy.com/bangalore-metro-phase-2-information-map/ Click on the Bus route to see step by step directions with maps, line arrival times and updated time schedules. Out of these proposed 61 stations, 12 stations are to be built underground. The Phase 1 metro line takes a length of 42.30 kilometres. About J P Nagar 4th Phase Metro J P Nagar 4th Phase Metro station of Namma Metro is situated on Red Line Bangalore Metro. Also, it would not be wrong if we say that Bangalore Metro is also contributing in reducing the overall carbon footprint of the city as more and more people are switching metro for their daily commute to work or for personal travel. The state government is yet to approve the final alignment, but a letter written by Namma Metro managing director to the Bangalore Metropolitan Transport Corporation (BMTC) in January indicates that Phase III has been “finalised”. Keeping in mind the strategic location of Bangalore Metro Stations and Route, on a daily basis lakhs of people travel by it. Complete Latest Bangalore Metro Map Guide with proper High Quality Image.All Stations With Names & Direction All information Provided. The Purple line is also known as the East-West corridor. Bangalore Metro Route Station List – Purple Line, Baiyappanahalli (Interchange/Connections/Baiyappanahalli Railway Station) – Swami Vivekananda Road – Indiranagar – Halasuru – Trinity – Mahatma Gandhi Road – Cubbon Park – Vidhana Soudha –  Sir M Visveshwaraya – (Majestic Green Line; Interchange/Connections/ Bangalore City Railway Station; Kempegowda Bus Terminal) – City Railway Station (Interchange/Connections/Bangalore City Railway Station) – Magadi Road – Hosahalli – Vijayanagar – Attiguppe – Deepanjali Nagar – Mysore Road. This phase should be completed by 2019. Bangalore Metro has been planned in phases. The total cost of the Bangalore metro phase 1 has been Rs. However, residents feel that the Phase 1 metroline is not sufficient for a growing city. Bangalore Metro Travel Guide: Fare Rules, Helpline no. The work for Phase 2, 2A is going on which will add more 74 KM of in the existing Bangalore Metro Rail Network. Phase 3 is in the planning stage. The Yellow Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The five new stations will be – Anjanapura cross road, Krishna Leela Park, Vajrahalli, Thalaghattapura and Anjanapura NICE junction. Save my name, email, and website in this browser for the next time I comment. This agency is a joint venture of the government of India and the government of Karnataka. As of March 2020, tendering for civil construction is ongoing while tendering for va… To know about all the places which are connected to Bangalore Metro Stations, The Bangalore Metro Route Map can be your perfect guide. Disclaimer: This website(IMR) has made all the efforts to make this image accurate. The system uses contactless smart tokens and contactless smart card. It will add two new lines in addition to the extensiones built in phase 1. The prices are reasonable, maybe a little higher than other city metros but still worth it for the time savings alone. The green line currently consists of 24 stations and is 24.40 kms. Smartcard holders get a discount of 5% on fare. The 18.82 km line connects R.V. But with Phase 2, in the near future, the green line will have 32 stations and will run 34.46 kms. Even domestic and international tourists and travellers have started to prefer Bangalore Metro over other modes of transport because of reasons such as its being cost-effective, comfortable, time-saving, and most importantly safety. But with Phase 2 in place, the Purple Line will have 36 new stations making it run 42.51 kms long. The Southern Green Line will be the extension of Reach 4 from Yelachenahalli to Anjanapura Township along the Kanakpura Road. The 24 stations that are presently operational, have been mentioned below. The construction work for Bangalore Metro Phase 3 & 4 has still not started yet. Here’s What Needs To Be Done. These are supplied by BEML. It is a rapid metro transit system developed for the convenience of the people of Bangalore. Tendering for Phase 4’s civil construction began in June 2019, with piling work on Line-8’s extension commencingon December 30, 2019 at Haiderpur-Badli Mor. Bangalore metro phase 2 is set to be built at an estimated cost of Rs 26,405 crore. Road station is the terminal station on city side where an interchange is being provided with the Green Line. Phase 1 has 2 metro lines, i.e. Nagasandra – Dasarahalli – Jalahalli – Peenya Industry – Peenya – Goraguntepalya – Yeshwanthpur, (Interchange/Connections/Yesvantpur Railway Station), (Purple Line/Interchange/Connections/Bangalore City Railway Station/Kempegowda Bus Terminal), (Interchange/Connections/Baiyappanahalli Railway Station), (Majestic Green Line; Interchange/Connections/ Bangalore City Railway Station; Kempegowda Bus Terminal), (Interchange/Connections/Bangalore City Railway Station), Bangalore Metro Green Line – Route Map, Stations, Timings, Destinations, Bangalore Metro Purple Line – Route Map, Stations, Timings, Destinations. Phase 1 has 2 metro lines, i.e. Phase 2 is mainly the extension of the existing metro lines. But with Phase 2, the last stop would be Anjanapura township. This makes Bangalore metro the 4 th largest metro network in India. The purple line currently ends at Mysore road, but it will be extended till Challeghatta, which is an extension of 8.81 kms. The gauge size of the track is a standard gauge(1435mm). Delhi Metro Phase 4 project’s routes with 6 lines totaling 103.93 km within Delhi’s borders were finalizedin July 2015. Address of J P Nagar 4th Phase is . The following metro route map shows the list of metro train stations and the existing routes. This figure is from February 2020. Road with Bommasandra and is fully elevated with 16 stations. The project faced funding issues due to which a majority of civil construction contracts were a… Purple Line can travel at a maximum speed of about 80 KMPH. For project info, route maps with stations, fares, news & construction updates visit:http://themetrorailguy.com/bangalore-metro-information-map-updates/ In phase II, it includes the construction of the extensions of the two corridors on first phase (East-West and North-South), and two new lines. This stretch of the project will see the development of 61 metro stations. It covers a total of 5 stations for a distance of … The Green Line currently terminates at Nagasandra station, but with Phase 2 in motion, the line will now extend upto Bangalore International Exhibition Center (BIEC). Nagasandra – Dasarahalli – Jalahalli – Peenya Industry – Peenya – Goraguntepalya – Yeshwanthpur – Sandal Soap Factory – Mahalaxmi – Rajajinagar – Kuvempu Road – Srirampura – Sampige Road – Majestic (point of interchange to purple line) – Chickpet – KR Market – National College – Lalbagh – Southend Circle – Jayanagar – Rashtreeya Vidyalaya Road – Banashankari – Jayaprakash Nagar – Yelachenahalli. It gets a little rushed during the morning and evening office hours, but otherwise the crowd is bearable. The 6th (final) section was inauguratedby the President on June 17 2017 and commercial operations started on the next day. Phase 2 of the metro line is the next big plan in motion for the city of Bangalore. The second phase of Namma Metro will add 72.1 kms of tracks and 61 stations (13 kms would circulate underground and the rest in elevated viaducts). This new phase is exciting for the city, as it will help reduce traffic on the road and help fight air pollution on a larger scale for the city. Its first section, connecting Baiyyappanahalli – MG Road on the Purple Line, opened up in 2011. R.V. Locality map of Seshadripuram showing major roads, local train route, hotels, hospitals, schools, colleges, religious places and important landmarks of Seshadripuram, Bangalore. Bangalore’s growth over the past decade and more has been staggering.With the ridership of Namma Metro currently at 150,000 a day, and steadily increasing, Bangaloreans are hoping that the BMRCL (Bangalore Metro and Rail Corporation) finishes working on Namma Metro Phase 2 as soon as possible. The Green line is also known as the North-South corridor. Casting Bay First pour on Tuesday night around 9 PM. It’s not wrong to say that Bangalore Metro is becoming a lifeline of the citizens of Bangalore and some people can’t travel to work without the metro. Proposed Delhi Metro Phase 4 Map showing the metro connectivity. 11,609 Crores. Namma Metro is considered as the fourth longest operational metro network in India with 2 lines i.e. The three new stations will be – Manjunathnagar, Jindal and BIEC. The other part of Phase 2 is the addition of three new lines, which will take the color code blue, red and yellow. Currently, it has 300 coaches, divided into sets of 50 train-sets x 6. Unlike the metro stations constructed under phase I, all stations of phase 2 will be equipped with parking facilities. Complete Map of Phase 2 & 2A, Source: Google Image. The red metro line is the longest from the others. Construction for Bangalore (Namma Metro’s) 42.30 km first phase started in April 2007 and its first section, connecting Baiyyappanahalli – MG Road on the Purple Line, opened in 2011. The yellow line has two points of interchange (RV Road and Jayadeva Hospital). Currently southwards, the Green Line ends at Yelachenahalli station. In this article, we are going to share information regarding Bangalore Metro Route Map and Stations. It is going to be 21.2 kms long and will run from Gottigere to Nagawara. 10 to Rs. This means post Mysore road, there will be six new stations once Phase 2 is complete. Bangalore Metro Purple Line: Route Map, Stations, Timings, Destinations, Bangalore Metro Route Map 2020: Station List, Fare, Timings, To & From – Baiyappanahalli –  Mysore Road. As of June 2017, there are 40 metro stations in the network, which were completed and operational as a part of Phase I. 20-01-2020. The extension work began in October 2016 and is expected to be completed by August 2020. This means extending the green and purple lines. This makes Bangalore metro the 4th largest metro network in India. 60. Under the Bangalore Metro Phase 2 project, the green Line is being extended at both its terminal points. The next phases (Phase 2, Phase 2A and Phase 3B) of Bangalore metro is also planned to keep in mind to reduce the traffic on the arterial roads of the city and will connect major destinations across the city. Currently, only Phase 1 has been completed and delivered to the citizens of Bangalore. BENGALURU (Metro Rail News): Bengaluru Underground Metro Phase-II demolition work for Metro stations Corridor is now under process in 3 of the 4 stations scheduled that was stopped for over 2 months because of the lockdown. The metro fare on this line ranges from Rs. This is a 15.50 km stretch which means 13 new stations. Tokens are available only for a single journey. Our Bangalore Metro Map is in high definition and you can zoom in to see detailed information of Bangalore Metro Station phases and line-wise. The Bangalore Metro is developed keeping in mind to reduce the traffic problem faced by its citizens on a daily basis. The entire infrastructure of the metro and its phases is being operated by an agency known as The Bengaluru Metro Rail Corporation Limited (BMRCL). Bangalore Metro Station also which is officially known as Namma Metro is located in Bengaluru, Karnataka, India. Bangalore Metro. We all know the traffic condition of the Bangalore city. The six new stations are – Nayandahalli, Rajarajeshwari Nagar, Bangalore University, R.V College of Engineering, Mallasandra and Challeghatta.